Well, this all depends on many things. But for an average home with average difficulty level and experienced installer shouldnt take much more than two full days. I have seen some that were installed by two men in one full day and others that take a week. If you are using a pre-packaged system, such as the Heliomaxx Kits from Sunmaxx, they are designed to be assembled and commissioned with the utmost efficiency.
A DIY’er can take on an installation by him/herself as long as they are comfortable with a little roofing and some minor plumbing. For homeowners, it is imperative that you use a pre-packaged system.