Well, that all depends but usually 2 workers can install a simple DHW kit and have it fully commissioned within 3 days. There are some cases where only 2 days is required and some days more. Our Heliomaxx kits are designed for simplicity and we expect that you shouldn’t really need more than 48 total hours for a job and could be as low as 32.
Related Posts
How do I know if my system is performing the way it should be?
First of all, your system performance will be measured by BTU'S produced, NOT by temperature achieved. The simplest way to... read more
What is CSA?
What is CSA? read more
What can I do with excess energy in the summer?
Three choices- Steam, Drain or Dump. For most places in the US, there will be more solar gain in the... read more
My sensor cable is only 4 feet long. How do I wire it from the controller all the way to the collectors?
My sensor cable is only 4 feet long. How do I wire it from the controller all the way to... read more
How do I get into the adjustment submenu on my SmartMaxx-DHWPlus controller?
How do I get into the adjustment submenu on my SmartMaxx-DHWPlus controller? Press the “+” button to move through the main... read more
How do I get my SmartMaxx DHWPlus controller from Celcius to Farenheit?
How do I get my SmartMaxx DHWPlus controller from Celcius to Farenheit? Push the "+" button until you move to end... read more
What is the SRCC and why is it relevant to your products?
What is the SRCC and why is it relevant to your products? read more
How Do I Get My SmartMaxxDHWPlus Controller from German to English?
How do I get my SmartMaxxDHWPlus controller from German to English? With the controller plugged in, push the “+” button until... read more
Simulating Performance of Solar Thermal Systems
Solar thermal systems will behave differently depending on a few variables such as, the obvious, location but also angle of... read more
Leave a Reply
You must be logged in to post a comment.