Colorado – Interconnection Standards

Colorado – Interconnection Standards

Incentive Type Interconnection
Eligible Technologies Solar Thermal Electric, Photovoltaics, Landfill Gas, Wind, Biomass, Hydroelectric, Geothermal Electric, CHP/Cogeneration, Anaerobic Digestion, Fuel Cells using Renewable Fuels, Microturbines, Other Distributed Generation Technologies
Applicable Sectors Commercial, Industrial, Residential, Nonprofit, Schools, Utility, Agricultural, Institutional
Applicable Utilities All utilities (except certain small municipal utilities)
System Capacity Limit 10 MW
Standard Agreement Yes
Insurance Requirements Vary by system size and/or type; levels established by PUC
Installation Standards None Listed
Start Date None Listed

More Information Contact:

Bill Dalton
Colorado Public Utilities Commission
1560 Broadway, Suite 250
Denver, CO 80202
Phone: (303) 894-2908
E-Mail: [email protected]
Web Site: http://www.dora.state.co.us/PUC

Share this post